    Posted 10-08-2026 03:36

    Hello everyone,

    I am testing Routes in Maximo and would like to better understand the expected behavior when using the "Work Order Tasks" option.

    • Route contains 2 assets (route stops):
      • Asset A
      • Asset B
    • Route option selected: Work Order Tasks
    • A Job Plan containing 10 inspection activities is assigned to the PM.
    • The PM references the Route.

    When the PM generates a Work Order:

    • The 10 Job Plan activities are created as tasks on the Work Order.
    • The Route Stops are also added as tasks (for example, Tasks 1-10 = 10 Activities, Task 20 = Asset A, Task 30 = Asset B).
    • The Job Plan field on the Route Stops is read-only, which I understand is expected when using the Work Order Tasks option.

    Question:

    If the technician is expected to perform the same 10 inspection activities on each asset in the route, how does Maximo associate those activities with the individual route stops? 

    Since Job Plans cannot be assigned to Route Stops when "Work Order Tasks" is selected, I am trying to understand the intended best practice when the same checklist must be executed for every asset in the route and which option would be better out of three to select while creating the route?
    Thanks in advance for any guidance.
    Regards,
    Burhan

    #Assets
    #MaximoApplicationSuite
    #WorkManagement
    #MaximoVisualInspection
    #Assist

    ------------------------------
    Burhan Khan
    Andritz Hydro
    ------------------------------


  • 2.  RE: Route with "Work Order Tasks" and PM Job Plan - How are activities associated with each route stop?

    Posted 10-08-2026 16:05
    Edited by Christopher Winston 10-09-2026 05:54

    You have a few options depending on how closely you want the activities tied to each route asset.

    Option 1 - Child Work Orders (recommended)

    Configure the Route to create Child Work Orders. This route option allows a Job Plan to be associated to the Route Stop. When the PM generates work, each Route Stop becomes its own child work order against the relevant asset/location and receives the associated Job Plan tasks. This is generally the preferred approach when the same set of activities must be performed independently against each asset.

    Option 2 - Route Stops as Work Order Tasks

    If the preference is to avoid child work orders, Route Stops can be configured as Work Order Tasks. In this case, each Route Stop effectively becomes the activity itself, with the description populated as the inspection/check to perform.

    As the Route Stop can reference an asset or location, and the same asset can be specified multiple times on a route, this can be used to model multiple activities against the same asset.

    The drawback is that you are maintaining the activity definitions on the Route rather than within a Job Plan, so the same information can end up being maintained in multiple places.

    Option 3 - Inspection Forms

    If these 10 activities are really inspection questions/checks rather than maintenance tasks, it may be worth considering Inspection Forms instead.

    An Inspection Form can be associated to:

    a Route Stop
    a Multi Asset/Location record
    an Asset or Location directly

    This often provides a cleaner solution than creating large numbers of tasks purely to capture inspection responses.

    Additional consideration - Multi Asset/Location

    If a single work order is being used across multiple assets, the Multi Asset, Location and CI table includes the PROGRESS checkbox. This can be used as a per-asset sign-off to indicate that work has been completed against that specific asset/location. Some organizations use this as a lightweight way of tracking completion at the asset level and then add validation logic to ensure all applicable assets have been marked complete before the parent work order can be completed.

    Ultimately, if the requirement is:
    "Perform the same 10 activities independently against every asset on the route"

    then the Child Work Order approach is usually the cleanest and most maintainable solution. If the activities are actually inspections, an Inspection Form may be a better fit than tasks altogether.


    I hope this helps but as you have found out job plan tasks and route_stop tasks work independently of each other.

    If you have any more questions don't hesitate to ask

    ------------------------------
    Joey Baah
    Naviam
    ------------------------------



Newest Episode
Ep. 10 | How Naviam DataStudio Makes Data Imports Easier with Lee Daley

Steven Shull and Lee Daley explore how Naviam DataStudio helps IBM Maximo teams simplify bulk data imports, validate information before loading, and improve data quality and management.

MORE by Naviam Episode 10: How Naviam DataStudio Makes Data Imports Easier with Lee Daley
Watch Episode 10
Also available: Ep. 9 | Best Maximo Resources to Stay Informed