Maximo Open Forum

 View Only

As Left Survey Condition Meter Reading

  • 1.  As Left Survey Condition Meter Reading

    Posted 05-29-2024 08:53
    Edited by Gursev Bajwa 06-17-2024 09:58

    Is there a way that an As Left Survey Condition Meter Reading be populated, on mass, during the work order closure process? 


    #Assets

    ------------------------------
    Gursev Bajwa
    OCWA
    ------------------------------



Newest Episode
Ep. 2 | Adding a QR Code to a BIRT Report

Watch Steven Shull walk through how to add a QR code to a BIRT report and make Maximo reporting more scannable, connected, and useful in the field.

MORE by Naviam Episode 2 cover
Watch Episode 2
Also available: Ep. 1 | IBM Maximo Application Suite 9.2