Maximo Open Forum

 View Only

As Left Survey Condition Meter Reading

  • 1.  As Left Survey Condition Meter Reading

    Posted 05-29-2024 08:53
    Edited by Gursev Bajwa 06-17-2024 09:58

    Is there a way that an As Left Survey Condition Meter Reading be populated, on mass, during the work order closure process? 


    #Assets

    ------------------------------
    Gursev Bajwa
    OCWA
    ------------------------------



Featured Podcast
Episode 1 is live: IBM Maximo Application Suite 9.2

Watch or listen to Steven Shull and Phil Runion discuss the practical MAS 9.2 updates Maximo teams should know.

Watch the Podcast
MORE by Naviam Episode 1 cover
Watch the latest episode