Maximo Open Forum

 View Only

Visibility of Material Constraints in Graphical Scheduling

  • 1.  Visibility of Material Constraints in Graphical Scheduling

    Posted 03-10-2023 07:36

    Hi, Do we have visibility of Material (item availability) constraints in any of the Graphical Scheduling / Assignment applications. I remember it was there in initial versions of Scheduler. Is it removed in latest versions and MAS. Request help to understand this.


    #Scheduling

    ------------------------------
    Bhaskar Vimal
    Infosys
    ------------------------------


Featured Podcast
Episode 1 is live: IBM Maximo Application Suite 9.2

Watch or listen to Steven Shull and Phil Runion discuss the practical MAS 9.2 updates Maximo teams should know.

Watch the Podcast
MORE by Naviam Episode 1 cover
Watch the latest episode