IBM indicates this is a known issue with Maximo Asset Management 7.6.1.3 with IFIX018 installed:
IJ51002: When attepting to set a Contract Ref Num on Purchase Requesition for a Contract that has been revised.
Has anybody found a workaround for this? I've poked around the base code a bit and find it odd that IBM would break this in IFIX018.